Unsere Fachbereiche

No results were found for the filter!
Unika KS HM-lintel 3DF 2000x175x113 rear wall lintel - HM4200 Unika KS HM-lintel 3DF 2000x175x113 rear wall lintel - HM4200
delivery time : 4-6 Working days
€213.01
(€213.01 / Piece)
To the product
Rockwool fire protection board Termarock 40 1000x625x40mm Rockwool fire protection board Termarock 40 1000x625x40mm
delivery time : 4-6 Working days
€134.78
(€17.97 / square meters)
To the product
Rockwool clamp skirt 035 3000x1000x160mm Rockwool clamp skirt 035 3000x1000x160mm
delivery time : 4-6 Working days
€129.60
(€43.20 / square meters)
To the product
Aluminum perforated sheet 0.8x1000x2000mm anthracite RAL 7016 RV 5/8 Aluminum perforated sheet 0.8x1000x2000mm anthracite RAL 7016 RV 5/8
delivery time : 4-6 Working days
€59.26
(€59.26 / TAFEL)
To the product
GftK VDW 850 plus 2k joint mortar stone gr 25kg self-compacting GftK VDW 850 plus 2k joint mortar stone gr 25kg self-compacting
delivery time : 4-6 Working days
€148.75
(€5.95 / KILOGRAM)
To the product
Copper extension element for double pipe snow guard Copper extension element for double pipe snow guard
delivery time : 4-6 Working days
€10.12
(€10.12 / Piece)
To the product
Cembrit W177-5.5 (P5) corrugated board 2000x918mm VP pastel gray Cembrit W177-5.5 (P5) corrugated board 2000x918mm VP pastel gray
delivery time : 4-6 Working days
€140.42
(€140.42 / Piece)
To the product
Betomax Comax P(S1) 190-10mm/15cm H:15cm L:39cm W:16cm with abz Betomax Comax P(S1) 190-10mm/15cm H:15cm L:39cm W:16cm with abz
delivery time : 4-6 Working days
€74.83
(€59.86 / Linear meters)
To the product
Mastertec sealing sheet roll 160 VB2 fully coated on both sides with AbP Mastertec sealing sheet roll 160 VB2 fully coated on both sides with AbP
delivery time : 4-6 Working days
€345.20
(€17.26 / Linear meters)
To the product
Mastertec Nippel für Befestigungspacker Kegelkopfnippel Mastertec Nippel für Befestigungspacker Kegelkopfnippel
delivery time : 4-6 Working days
€2.86
(€2.86 / Piece)
To the product
Triuso broom handle 24/1400mm Triuso broom handle 24/1400mm
delivery time : 4-6 Working days
€9.76
(€9.76 / Piece)
To the product
Galvanized board 0.75x1000x2000mm per board 12Kg Galvanized board 0.75x1000x2000mm per board 12Kg
delivery time : 4-6 Working days
€55.68
(€4.64 / KILOGRAM)
To the product
Ugitop board 0.5x1000x2000mm Wst. 1.4301, 8kg board Ugitop board 0.5x1000x2000mm Wst. 1.4301, 8kg board
delivery time : 4-6 Working days
€131.36
(€16.42 / KILOGRAM)
To the product
Laths Fi./Ta. 18x48x4000mm GKL I-II techn. separated 12 pieces/bundle Laths Fi./Ta. 18x48x4000mm GKL I-II techn. separated 12 pieces/bundle
delivery time : 4-6 Working days
€62.88
(€1.31 / Linear meters)
To the product
Knauf expansion board GKB 12.5mm 600x2600mm HRK Pal. à 60 pieces Knauf expansion board GKB 12.5mm 600x2600mm HRK Pal. à 60 pieces
delivery time : 4-6 Working days
€16.15
(€10.35 / square meters)
To the product
Knauf joint cover strip Kurt 50mm 25m Knauf joint cover strip Kurt 50mm 25m
delivery time : 4-6 Working days
€30.58
(€30.58 / role)
To the product
Knauf Aquapanel joint tape 100mm 50m Requirement: 2.1m/m2 Knauf Aquapanel joint tape 100mm 50m Requirement: 2.1m/m2
delivery time : 4-6 Working days
€66.52
(€66.52 / role)
To the product
ITW Spit special nails P800 HC 6-22 22mm 500pcs magazined ITW Spit special nails P800 HC 6-22 22mm 500pcs magazined
delivery time : 4-6 Working days
€215.39
(€0.43 / Piece)
To the product
WUS ISO anchoring set WAP for wall connection profile WUS ISO anchoring set WAP for wall connection profile
delivery time : 4-6 Working days
€116.62
(€116.62 / Set)
To the product
Kopp junction box flush-mounted 70mm 36mm deep Kopp junction box flush-mounted 70mm 36mm deep
delivery time : 4-6 Working days
€0.32
(€0.32 / Piece)
To the product
SBD Surform replacement blade standard 5-21-293 SBD Surform replacement blade standard 5-21-293
delivery time : 4-6 Working days
€13.33
(€13.33 / Piece)
To the product
69 From 416
last seen

Newsletter

News about offers, events, our company and tips & tricks