No results were found for the filter!
PE construction film TYPE 200 (35% UT) transparent 50x4.0m roll PE construction film TYPE 200 (35% UT) transparent 50x4.0m roll
delivery time : 4-6 Working days
€234.67
(€1.17 / square meters)
To the product
Blanke Drain-MAT with grid blue 15x1m roll thickness 8mm Blanke Drain-MAT with grid blue 15x1m roll thickness 8mm
delivery time : 4-6 Working days
€344.55
(€22.97 / square meters)
To the product
Prima vapor barrier film B2 0.20mm white 50x2.0m sd-value > 100m Prima vapor barrier film B2 0.20mm white 50x2.0m sd-value > 100m
delivery time : 4-6 Working days
€179.69
(€1.80 / square meters)
To the product
Prodinger corrugated cardboard rolls 70mx90cm fine wave Prodinger corrugated cardboard rolls 70mx90cm fine wave
delivery time : 4-6 Working days
€74.73
(€74.73 / role)
To the product
Pavatex ADB underlayment 1.50x50m/roll = 75.00qm/roll Pavatex ADB underlayment 1.50x50m/roll = 75.00qm/roll
delivery time : 4-6 Working days
€508.50
(€6.78 / square meters)
To the product
PE construction film 0.03mm transparent 100x2.0m unfolded - 200qm roll PE construction film 0.03mm transparent 100x2.0m unfolded - 200qm roll
delivery time : 4-6 Working days
€89.49
(€0.45 / square meters)
To the product
Sika SikaProof® Sandwich Tape 25m roll 50mm wide Sika SikaProof® Sandwich Tape 25m roll 50mm wide
delivery time : 4-6 Working days
€178.50
(€7.14 / Linear meters)
To the product
PCI Lastogum 8kg bucket color: gray PCI Lastogum 8kg bucket color: gray
delivery time : 4-6 Working days
#NV €115.20 #NV €114.80
(€14.35 / KILOGRAM)
To the product
Dörken Delta-NB dimpled sheet 20x3.00m Dörken Delta-NB dimpled sheet 20x3.00m
delivery time : 4-6 Working days
€228.60
(€3.81 / square meters)
To the product
BauderFLEX TA 600 foil/fleece BauderFLEX TA 600 foil/fleece
delivery time : 4-6 Working days
€171.30
(€11.42 / square meters)
To the product
Prima Bitumen Primer 10l solvent-based Prima Bitumen Primer 10l solvent-based
delivery time : 4-6 Working days
€84.25
(€84.25 / bucket)
To the product
SGW glass silk fabric weber.sys 981 No. 2 MW 4mm 1mx50lfm roll SGW glass silk fabric weber.sys 981 No. 2 MW 4mm 1mx50lfm roll
delivery time : 4-6 Working days
€202.50
(€4.05 / square meters)
To the product
Knauf connection strip for Katja 200mm 15m Knauf connection strip for Katja 200mm 15m
delivery time : 4-6 Working days
€84.13
(€84.13 / role)
To the product
Pavatex LDB 0.02 airtight membrane 1.50x50m/roll = 75.00qm/roll Pavatex LDB 0.02 airtight membrane 1.50x50m/roll = 75.00qm/roll
delivery time : 4-6 Working days
€410.25
(€5.47 / square meters)
To the product
PCI Lastogum 25kg bucket color: gray PCI Lastogum 25kg bucket color: gray
delivery time : 4-6 Working days
#NV €250.00 #NV €249.25
(€9.97 / KILOGRAM)
To the product
Dörken DELTA-Terraxx strips 12.5x0.75m Dörken DELTA-Terraxx strips 12.5x0.75m
delivery time : 4-6 Working days
€128.34
(€13.69 / square meters)
To the product
Dörken Delta-EQ Drain 12,5x2,50 m Noppenbahn mit schwarzen Geotextil Dörken Delta-EQ Drain 12,5x2,50 m Noppenbahn mit schwarzen Geotextil
delivery time : 4-6 Working days
€316.25
(€10.12 / square meters)
To the product
SGW weber.tec Superflex B 240 joint sealing tape PVC 30m roll SGW weber.tec Superflex B 240 joint sealing tape PVC 30m roll
delivery time : 4-6 Working days
€1,345.80
(€44.86 / Linear meters)
To the product
3 From 8
last seen

Newsletter

News about offers, events, our company and tips & tricks