Sonhofer Portland pozzolanic cement CEM II/ BP 32.5 N
Portland pozzolanic cement CEM II/ BP... more
Productdescription
Sonhofer Portland pozzolanic cement CEM II/ BP 32.5 N
Portland pozzolanic cement CEM II/ BP 32.5 N (trass cement) is a hydraulic binder in accordance with DIN EN 197-1. Strict production control throughout the entire manufacturing process ensures consistent, high-quality results. This Sonhofer Portland pozzolanic cement is suitable for the production of all concretes in accordance with DIN EN 206-1/ DIN 1045-2, except for concrete exposed to exposure class XF2 or XF4. The CEM II/ BP 32.5 N is also very suitable for the production of masonry mortars (normal mortars) in accordance with DIN V 18580 for external and internal walls as well as for the production of external, internal and renovation plasters in accordance with DIN V 18550.
Properties:
Portland pozzolanic cement CEM II/ BP 32.5 N (trass cement) is a hydraulic binder in accordance with DIN EN 197-1. Strict production control throughout the entire manufacturing process ensures consistent, high-quality results. This Sonhofer Portland pozzolanic cement is suitable for the production of all concretes in accordance with DIN EN 206-1/ DIN 1045-2, except for concrete exposed to exposure class XF2 or XF4. The CEM II/ BP 32.5 N is also very suitable for the production of masonry mortars (normal mortars) in accordance with DIN V 18580 for external and internal walls as well as for the production of external, internal and renovation plasters in accordance with DIN V 18550.
Properties:
- slowed strength development
- good post-hardening
- high density of the concretes, mortars and plasters produced
- lime efflorescence is reduced
- low in chromate
- easy to process concretes, mortars and plasters
- Composition: Portland cement clinker, trass and calcium sulfate (as setting regulator)
Technical Data
| Druckfestigkeit: | min. 32,5 Mpa (nach 28 Tagen) |
| Artikelart: | Cem II/B-P 32,5 N (Trasszement) |
| Hersteller: | Solnhofer Beton |
Solnhofer Portland pozzolana cement CEM II BP 32.5 N 25kg - (trass cement)
- Article no.: 0110120029
- EAN: 2001101200298
€14.07
*
(€0.56 / KILOGRAM)
incl. VAT plus shipping costs
delivery time 4-6 Working days
Gefahr
Please note the safety data sheet/dangerous goods under product links!
Product can be picket up at
Amount:
Collomix hand mixer Xo6 HF m MK 160 HF 1600 Watt 230 Volt 2-speed - 20.436
delivery time :
8-9 Working days
Price on request
Mortar bucket PE black Profi-Line 65l 756566
delivery time :
4-6 Working days
€13.33
incl. VAT / pcs.
Triuso Maurer-u. Plastering trowel 160mm stainless steel with gooseneck
delivery time :
4-6 Working days
€14.64
incl. VAT / pcs.
Solnhofer Portland cement CEM I 42.5 N 25kg low-chromate normal cement
delivery time :
5-6 Working days
Price on request
Dyckerhoff white cement CEM I 42.5 R dw 25kg
delivery time :
3-4 Working days
Price on request
Dyckerhoff white cement CEM I 42.5 R dw 25kg
delivery time :
9-10 Working days
Price on request
Solnhofer Portland cement CEM I 42.5 N 25kg low-chromate normal cement
delivery time :
11-12 Working days
Price on request
Solnhofer Portland limestone cement CEM II A-LL 42.5 N 25kg
delivery time :
4-6 Working days
€11.36
incl. VAT / pcs.
HSK shaft with short support cam at the top without fold part 8 h=250mm
delivery time :
4-6 Working days
€30.46
incl. VAT / pcs.
GDM TIEFBORD nativo Grey W/H/L: 8/25/100cm with bevel
delivery time :
4-6 Working days
€10.35
incl. VAT / pcs.
Schwenk Portland cement low in chromate CEM I 42.5 R-SR 0 - 25kg
delivery time :
13-15 Working days
Price on request
Sakret concrete screed fine BE fine 30kg 0-4mm CT-C35-F5 approx. 15l yield
delivery time :
4-6 Working days
€13.21
incl. VAT / pcs.
HSK shaft with support cams long at the top without rebate part 1 h=480mm
delivery time :
4-6 Working days
€34.15
incl. VAT / pcs.
Attachment 300x300mm Kl. B125 SW 16mm cast desk form height 100mm
delivery time :
4-6 Working days
€98.77
incl. VAT / pcs.
HSK bucket short galvanized sludge bucket vz for yard low
delivery time :
4-6 Working days
€39.39
incl. VAT / pcs.
Dorsicoat PQK 8 0.3-0.8mm 25kg quartz sand paper bag
delivery time :
4-6 Working days
€21.18
incl. VAT / pcs.
Knauf Reinforcing Mesh 4x4mm 100/50 100cm wide - 50m roll
delivery time :
8-9 Working days
Price on request
PCI Flexmörtel S1 20kg Color: Grey
delivery time :
4-6 Working days
€69.00
incl. VAT / pcs.
PE construction film TYPE 200 (35% UT) translucent 4x50m - 200sqm/roll
delivery time :
4-6 Working days
€166.36
incl. VAT / pcs.
Support ring DIN 4034 Part 2 AR DN 625 h=40mm
delivery time :
4-6 Working days
€19.64
incl. VAT / pcs.
Support ring DIN 4034 Part 2 AR DN 625 h=80mm
delivery time :
4-6 Working days
€23.21
incl. VAT / pcs.
Support ring DIN 4034 Part 2 AR DN 625 h=200mm
delivery time :
4-6 Working days
€45.82
incl. VAT / pcs.
HSK support ring part 28 h=60mm
delivery time :
4-6 Working days
€19.87
incl. VAT / pcs.
Filter fleece TS 30 155 gr./sqm 2x100m GRK 3
delivery time :
11-12 Working days
Price on request
BSG screed grid 2x1m 2.0mm vz type 50 with spacer foot
delivery time :
4-6 Working days
€12.38
incl. VAT / pcs.
Solnhofer Portland limestone cement CEM II A-LL 42.5 N 25kg
delivery time :
4-6 Working days
€11.36
incl. VAT / pcs.
Solnhofer Portland limestone cement CEM II A-LL 52.5 N 25kg high-quality cement
delivery time :
4-6 Working days
€11.72
incl. VAT / pcs.
Solnhofer Portland cement CEM I 42.5 N 25kg low-chromate normal cement
delivery time :
11-12 Working days
Price on request
GARTENAKTION
Prima Pflanzerde Torffrei 60 ltr.
delivery time :
4-6 Working days
5.05 €
#NV
€11.89
#NV
incl. VAT / pcs.
KGEM Rohr PP-MD grün SN 10 DN/OD250 3.0m DIN EN 14758
delivery time :
4-6 Working days
€102.63
incl. VAT / pcs.
BWL Munich Leistenstein grey 8.5x17.5x100cm bevelled on one side
delivery time :
4-6 Working days
€8.21
incl. VAT / pcs.
GDM ORIG. MUNICH PATH PL. nativo Gray L/W/D: 35/35/6.5cm without bevel
delivery time :
4-6 Working days
€5.16
incl. VAT / pcs.
NIF WPC 2.0 base profile anthracite 40x60x4000mm with click function
delivery time :
4-6 Working days
€48.08
incl. VAT / pcs.
GDM TIEFBORD nativo Grey W/H/L: 8.5/17.5/100cm with bevel
delivery time :
4-6 Working days
€8.33
incl. VAT / pcs.
GARTENAKTION
Flex Premium Bit Set 41-piece
delivery time :
4-6 Working days
32.50 €
#NV
€63.67
#NV
incl. VAT / pcs.
BWL Curve Stone 8.5x17.5x78.5cm grey Radius R = 0.50m for outer curve
delivery time :
4-6 Working days
€40.94
incl. VAT / pcs.
Weserwaben Trend-Line Long cover stone 57x19x12.5cm grey-white mottled
delivery time :
16-18 Working days
Price on request
Lithonplus deep border 100x20x8cm stone grey exposed concrete Form-B
delivery time :
13-15 Working days
Price on request
Schwenk Portland cement low in chromate CEM I 42.5 R-SR 0 - 25kg
delivery time :
13-15 Working days
Price on request
Basic element Travino Walling 40x20x15cm sandstone. structured
delivery time :
16-18 Working days
Price on request
Plate Fiori 80x40x3.8cm white sanded
delivery time :
16-18 Working days
Price on request
Platte Old Town Basic Package sandstone structured
delivery time :
16-18 Working days
Price on request
Mesh tension rod 6x1050mm galvanized and powder-coated green
delivery time :
7 Working days
Price on request
Wire tensioner 2/100mm galvanized/coated green
delivery time :
7 Working days
Price on request
Tension and binding wire 2.0mm/50m galvanized and green coated RAL 6005
delivery time :
26-30 Working days
Price on request
Strut 40x1750mm with clamp 40mm galvanized and powder-coated green RAL 6005
delivery time :
7 Working days
Price on request
Fence post vz/green 40x1750mm incl. cap and wire holder
delivery time :
7 Working days
Price on request
Tension and binding wire green 3.8mm/55m
delivery time :
7 Working days
Price on request
Square mesh NW 50x2.8x1000mm 25m galvanized and green coated RAL 6005
delivery time :
7 Working days
Price on request
FOUNDATION STONE nativo gray W/H/L: 5/30/100cm chamfered with tongue and groove
delivery time :
16-18 Working days
Price on request
GDM ORIG. MUNICH PAVEMENT PL. nativo Gray L/W/D: 35/35/10cm without bevel
delivery time :
4-6 Working days
€8.51
incl. VAT / pcs.
NIF WPC plank Strong supporting plank/solid plank 38x140x4000 grey
delivery time :
12-14 Working days
Price on request
NIF Popular Solid 25x138mm brown 6m with building approval
delivery time :
12-14 Working days
Price on request
Smooth edge board DYNUM nigella 3600x72x17mm
delivery time :
16-18 Working days
Price on request
Brown-Stones CEMENTO (Set 9 Plates) 25x25x45 No.205 ash
delivery time :
20-23 Working days
Price on request
Barefoot board PREMIUM PLUS (Jumbo) lava brown 3000x242x21mm
delivery time :
16-18 Working days
Price on request
Barefoot board DYNUM nigella solid 6000 x 293 x 25 mm
delivery time :
16-18 Working days
Price on request
Barefoot board DYNUM cardamom solid 3600 x 293 x 25 mm
delivery time :
16-18 Working days
Price on request
Barefoot board CLASSIC solid lava brown 6000x145x21mm
delivery time :
16-18 Working days
Price on request
Barefootboard CLASSIC (Jumbo) slate grey 6000x242x21mm
delivery time :
16-18 Working days
Price on request
megawood mounting bracket black 50 pieces including screws and bit
delivery time :
16-18 Working days
Price on request
Triuso whisk with ice scraper and scraper lip 42cm - 0274261
delivery time :
4-6 Working days
€10.47
incl. VAT / pcs.
Schwenk Portland cement low in chromate CEM I 42.5 R-SR 3 - 25kg Brown/Green
delivery time :
11-12 Working days
Price on request
NIF base profile ALU 39x39x4000mm 9010119-COM
delivery time :
13-15 Working days
Price on request