Civil engineering

Stable and resilient

The foundation of a large project

The work of civil engineering is often underground, hidden and not directly visible. Nevertheless, civil engineering literally creates the foundation of every construction project. Infiltration systems, drainage channels, plastic channels, sewage shafts, as well as paving and curbs are the first steps that will follow big things. Whether it is a new build or renovation, with KRAFT as your partner you lay a strong first foundation for your project.

 

OUR PRODUCT PORTFOLIO

  • Drainage channels made of concrete / polymer concrete / plastic and steel
  • Concrete slotted channels
  • Infiltration systems
  • Plastic channels made of PP / PVC and PE
  • Stoneware pipes / cast sewer pipes
  • Reinforced concrete / concrete pipes
  • Concrete / plastic sewer shafts
  • Cast sewer for street and yard drains
  • Cable protection pipes and molded parts
  • Separation technology
  • Paving and curbs
  • Accessories for asphalt installation
  • and much more

 

OUR SERVICES

  • Technical solutions for civil engineering projects
  • Delivery of your ordered stock items within 24 hours (logistics partner GO-Express & Logistics)
  • National delivery service with 20 trucks in daily use
Stable and resilient The foundation of a large project The work of civil engineering is often underground, hidden and not directly visible. Nevertheless, civil engineering literally... learn more »
Close the window
Civil engineering

Stable and resilient

The foundation of a large project

The work of civil engineering is often underground, hidden and not directly visible. Nevertheless, civil engineering literally creates the foundation of every construction project. Infiltration systems, drainage channels, plastic channels, sewage shafts, as well as paving and curbs are the first steps that will follow big things. Whether it is a new build or renovation, with KRAFT as your partner you lay a strong first foundation for your project.

 

OUR PRODUCT PORTFOLIO

  • Drainage channels made of concrete / polymer concrete / plastic and steel
  • Concrete slotted channels
  • Infiltration systems
  • Plastic channels made of PP / PVC and PE
  • Stoneware pipes / cast sewer pipes
  • Reinforced concrete / concrete pipes
  • Concrete / plastic sewer shafts
  • Cast sewer for street and yard drains
  • Cable protection pipes and molded parts
  • Separation technology
  • Paving and curbs
  • Accessories for asphalt installation
  • and much more

 

OUR SERVICES

  • Technical solutions for civil engineering projects
  • Delivery of your ordered stock items within 24 hours (logistics partner GO-Express & Logistics)
  • National delivery service with 20 trucks in daily use
No results were found for the filter!
Shaft ring with fold DIN 4034 Part 2 SR-F 600x500mm smooth Shaft ring with fold DIN 4034 Part 2 SR-F 600x500mm smooth
delivery time : 4-6 Working days
€94.96
(€94.96 / Piece)
To the product
GDM HIGH BORD nativo gray W/H/L: (12/15)/30/100cm GDM HIGH BORD nativo gray W/H/L: (12/15)/30/100cm
delivery time : 4-6 Working days
€25.11
(€25.11 / Piece)
To the product
GftK VDW 840 plus 1K joint mortar stone gr from 3mm joint bucket 25kg GftK VDW 840 plus 1K joint mortar stone gr from 3mm joint bucket 25kg
delivery time : 4-6 Working days
€131.00
(€5.24 / KILOGRAM)
To the product
Attachment 300x300mm Kl. B125 SW 16mm cast desk form height 100mm Attachment 300x300mm Kl. B125 SW 16mm cast desk form height 100mm
delivery time : 4-6 Working days
€99.84
(€99.84 / Piece)
To the product
BG Fassadenrinne Modell "ISAR" 1500x155x45 beids. perforiert verzinkt BG Fassadenrinne Modell "ISAR" 1500x155x45 beids. perforiert verzinkt
delivery time : 4-6 Working days
€108.41
(€108.41 / Piece)
To the product
KGB Bogen PP-MD grün DN/OD125 30° DIN EN 14758 KGB Bogen PP-MD grün DN/OD125 30° DIN EN 14758
delivery time : 4-6 Working days
Price on request
To the product
Joint filling compound 11 kg according to SNV 164 and ZTV for StB 01 Joint filling compound 11 kg according to SNV 164 and ZTV for StB 01
delivery time : 4-6 Working days
€64.13
(€5.83 / KILOGRAM)
To the product
SGW weber.tec Superflex D 24 reactive sealing 24kg combination container SGW weber.tec Superflex D 24 reactive sealing 24kg combination container
delivery time : 4-6 Working days
€248.40
(€10.35 / KILOGRAM)
To the product
Street gully bottom 1a DN 150 with KG socket h=315mm Street gully bottom 1a DN 150 with KG socket h=315mm
delivery time : 4-6 Working days
€44.98
(€44.98 / Piece)
To the product
Support ring 625mm height 80mm non-slip DIN 4034 Part 1 Support ring 625mm height 80mm non-slip DIN 4034 Part 1
delivery time : 4-6 Working days
€34.39
(€34.39 / Piece)
To the product
Support ring 625mm height 60mm non-slip DIN 4034 Part 1 Support ring 625mm height 60mm non-slip DIN 4034 Part 1
delivery time : 4-6 Working days
€32.13
(€32.13 / Piece)
To the product
Kabuflex double socket DN 110 Kabuflex double socket DN 110
delivery time : 4-6 Working days
€6.31
(€6.31 / Piece)
To the product
GftK VDW 850 plus 2k joint mortar stone gr 25kg self-compacting GftK VDW 850 plus 2k joint mortar stone gr 25kg self-compacting
delivery time : 4-6 Working days
€148.75
(€5.95 / KILOGRAM)
To the product
Blanke Drain-MAT with grid blue 15x1m roll thickness 8mm Blanke Drain-MAT with grid blue 15x1m roll thickness 8mm
delivery time : 4-6 Working days
€312.45
(€20.83 / square meters)
To the product
ACO mesh grate Drainlock Q+ NW 100 B125 0.5m MW 30x10mm STVZ ACO mesh grate Drainlock Q+ NW 100 B125 0.5m MW 30x10mm STVZ
delivery time : 4-6 Working days
€60.21
(€60.21 / Piece)
To the product
Wavin Acaro PP Blue SN 12 RW pipe DN 200 BL 1000mm with molded. sleeve Wavin Acaro PP Blue SN 12 RW pipe DN 200 BL 1000mm with molded. sleeve
delivery time : 4-6 Working days
€134.47
(€134.47 / Linear meters)
To the product
Gftk VDW 400plus Color 25kg grey cement joint mortar FB 3-25 mm Gftk VDW 400plus Color 25kg grey cement joint mortar FB 3-25 mm
delivery time : 4-6 Working days
€86.25
(€3.45 / KILOGRAM)
To the product
Street gully intermediate part 6a h=290mm Street gully intermediate part 6a h=290mm
delivery time : 4-6 Working days
€26.89
(€26.89 / Piece)
To the product
Support ring DIN 4034 Part 2 AR DN 625 h=200mm Support ring DIN 4034 Part 2 AR DN 625 h=200mm
delivery time : 4-6 Working days
€45.82
(€45.82 / Piece)
To the product
Support ring 625mm height 100mm non-slip DIN 4034 Part 1 Support ring 625mm height 100mm non-slip DIN 4034 Part 1
delivery time : 4-6 Working days
€36.65
(€36.65 / Piece)
To the product
5 From 53
last seen

Newsletter

News about offers, events, our company and tips & tricks