No results were found for the filter!
VIBA perforated tape 50x2.0 mm galvanized Hole Ø 20/22mm Hole spacing 50mm
delivery time :
4-6 Working days
€282.75
(€11.31 / Linear meters)
Betonstahlkupplung D25 L = 390mm mit Sichtloch
delivery time :
4-6 Working days
€142.80
(€142.80 / Piece)
Mastertec earthing fixed point without axis A4 stainless steel - DN 80mm
delivery time :
4-6 Working days
€32.13
(€32.13 / Piece)
Nevoga Plexus bracket strip 12mm- 150mm WS 270-290 reinforcement connection 225-12-15
delivery time :
4-6 Working days
€60.25
(€48.20 / Linear meters)
TRiGOSYS screw bracket for clamping the adhesive joint
delivery time :
4-6 Working days
€10.83
(€10.83 / Piece)
Mastertec cross clamp with thread M10 for earthing fixed point stainless steel A4...
delivery time :
4-6 Working days
€55.93
(€55.93 / Piece)
Nevoga Plexus bracket strip 12mm- 150mm WS 240-270 reinforcement connection 205-12-15
delivery time :
4-6 Working days
€58.90
(€47.12 / Linear meters)
Betonstahlkupplung D28 L = 420mm mit Sichtloch
delivery time :
4-6 Working days
€228.48
(€228.48 / Piece)
PEC-TA-CE-38/17-FV-PKF-3050mm anchor rail 3050mm long hot-dip galvanized
delivery time :
4-6 Working days
€103.79
(€34.03 / Linear meters)
Nevoga Pyraplex stirrup bar 12mm-150mm WS 240-270 reinforcement connection 202-12-15
delivery time :
4-6 Working days
€80.93
(€64.74 / Linear meters)
Nail for FB formwork stop length 76-82mm C8 - 100 pieces pack
delivery time :
4-6 Working days
€63.00
(€0.63 / Piece)
Betonstahlkupplung D12 L = 180mm mit Sichtloch
delivery time :
4-6 Working days
€51.53
(€51.53 / Piece)
Formwork stop glass fiber Ø 9/10x120mm PU: 50 pieces
delivery time :
4-6 Working days
€137.00
(€2.74 / Piece)
Corrosion protection tape Petrolatum 50mm KEB50/50 - 10m/roll with cotton insert
delivery time :
4-6 Working days
€25.47
(€25.47 / Piece)
Nevoga Plexus stirrup bar 8mm- 150mm WS 200-240 reinforcement connection 175-8-15
delivery time :
4-6 Working days
€30.50
(€24.40 / Linear meters)
Nevoga Plexus bracket strip 12mm- 150mm WS 200-240 reinforcement connection 175-12-15
delivery time :
4-6 Working days
€58.01
(€46.41 / Linear meters)
Betomax Comax P(S1) 140-12mm/15cm H:15cm L:46cm W:11cm with abz
delivery time :
4-6 Working days
€84.94
(€67.95 / Linear meters)
Lightning protection round wire Rd 10mm fvz approx. 51kg/81.6m zinc coating 350g/m²
delivery time :
4-6 Working days
€280.99
(€5.51 / KILOGRAM)
Betomax Comax P(S1) 190-12mm/15cm H:15cm L:46cm W:16cm with abz
delivery time :
4-6 Working days
€97.58
(€78.06 / Linear meters)
Combi-sleeve titanium max. breaking load in B25 181kN - L 28cm - thread D15
delivery time :
4-6 Working days
€1,178.00
(€11.78 / Piece)
Scaffolding bracket DM 10mm made of BST IV ribbed
delivery time :
4-6 Working days
€4.40
(€4.40 / Piece)
Grounding strap 30x3.5mm stainless steel V4A 1.4404 approx. 51kg/61.2m
delivery time :
13-15 Working days
Price on request
Cross connector rd/rd without intermediate plate type KVG 11 V4A
delivery time :
26-30 Working days
Price on request
Betomax Comax P(S1) 220-10mm/10cm H:15cm L:39cm W:19cm
delivery time :
11-12 Working days
Price on request