Alustar Eco finish Inspection flap for plasterboard walls/ceilings Ready to install: filled... more
Productdescription
Alustar Eco finish
Inspection flap for plasterboard walls/ceilings
Ready to install: filled and sanded
Snap fastener with wire clip
Safety rope with carabiner
Impregnated plasterboard insert
Springs push the unlocked door leaf out of the frame.
The flap can now be opened.
To remove, lift the door leaf slightly when it is open, then turn it diagonally and remove it downwards.
Open and remove the flap as for ceiling installation.
Inspection flap for plasterboard walls/ceilings
Ready to install: filled and sanded
Material:
Aluminum profile connected with galvanized corner connectorsSnap fastener with wire clip
Safety rope with carabiner
Impregnated plasterboard insert
Surface:
The surface of the door leaf is filled and sanded flat. Please treat the door leaf carefully! We recommend impregnating the surface before painting. Please observe the processing instructions for paint/plaster.Function:
Pressure on the closed door leaf unlocks the lock.Springs push the unlocked door leaf out of the frame.
The flap can now be opened.
Ceiling installation:
After opening, the door leaf hangs loosely in the frame with the hinge brackets.To remove, lift the door leaf slightly when it is open, then turn it diagonally and remove it downwards.
Wall installation:
Always install the flap so that the lock is at the top.Open and remove the flap as for ceiling installation.
Safety:
All flaps are equipped with a safety rope. The safety rope must always be hooked back in after maintenance work!Painting, plastering:
Please note when applying paint or plaster: The gap between the door leaf and frame must remain absolutely free. Dried paint or plaster residues in the joints prevent the door from functioning properly! Please remove the door leaf before painting and paint it separately!Installation:
In the packaging you will find a screw set with protective caps and installation instructions.
Technical Data
| Serie: | Prima |
| Marke: | Upmann |
| Anwendungsbereich Trockenbau: | Wand & Decke |
| Einlage: | true |
| Einlagenstärke (mm): | 25 |
| Material Trockenbau: | Aluminium |
| Modell: | ECO Finish |
| Tiefe (mm): | 15.0 |
| Außenlänge (mm): | 544.0 |
| Innenlänge (mm): | 497.0 |
| Außenbreite (mm): | 544.0 |
| Material Einlage: | GKBI |
| Innenbreite (mm): | 497.0 |
| Artikelart: | Revisionsklappe |
| Hersteller: | PRIMA |
PRODUCT LINKS
Prima inspection hatch ECO Finish 50x50cm 2x12.5mm GKI - Surface Q3 - 21088
- Article no.: 3001070447
- EAN: 4005046210884
€164.22
*
(€164.22 / Piece)
incl. VAT plus shipping costs
delivery time 8-9 Working days
Product can be picket up at
Amount:
Prima inspection hatch ECO Finish 40x40cm 2x12.5mm GKI - Surface Q3 -21087
delivery time :
8-9 Working days
€138.04
incl. VAT / pcs.
Prima inspection hatch ECO Finish 30x30cm 2x12.5mm GKI - Surface Q3 - 21086
delivery time :
8-9 Working days
€110.91
incl. VAT / pcs.
Prima inspection hatch ECO Finish 60x60cm 2x12.5mm GKI - Surface Q3 - 21089
delivery time :
8-9 Working days
€190.40
incl. VAT / pcs.
Prima inspection hatch ECO Finish 20x20cm 2x12.5mm GKI - Surface Q3 - 21085
delivery time :
8-9 Working days
€91.04
incl. VAT / pcs.
GSC Babylight inspection flap 300x300mm prepared for approx. 1x12.5mm GK - 100030
delivery time :
5-6 Working days
€85.09
incl. VAT / pcs.
GSC Babylight inspection flap 500x500mm prepared for approx. 1x12.5mm GK - 100050
delivery time :
5-6 Working days
€104.84
incl. VAT / pcs.
GSC Babylight inspection flap 500x500mm prepared for approx. 1x12.5mm GK - 100050
delivery time :
4-6 Working days
€104.84
incl. VAT / pcs.
MASCOT® Customized JackE schwarzblau Gr. L
delivery time :
4-6 Working days
€141.61
incl. VAT / pcs.
Proleveling leveling device cross for 5mm joint width (100 pieces)
delivery time :
4-6 Working days
€30.58
incl. VAT / pcs.
Basic element Vermont Kompakt 30x15x12cm grey burnished aged
delivery time :
26-30 Working days
Price on request
Kann Platte Vanity 60x60x5.5cm light grey satin
delivery time :
16-18 Working days
Price on request
Safety boots S3 Verona size 39 black/orange
delivery time :
9-10 Working days
Price on request
Maisch base profile WDVS 90810 2.5m aluminum 100mm trough shape
delivery time :
4-6 Working days
€37.13
incl. VAT / pcs.
Safety shoe S3 Bestboy size 41
delivery time :
4-6 Working days
€45.46
incl. VAT / pcs.
MASCOT thermal vest with CLIMASCOT® moss green/black M
delivery time :
13-15 Working days
Price on request
PCI Pecilastic U 5m roll Color: Cover fleece orange
delivery time :
4-6 Working days
€147.55
incl. VAT / pcs.
ACO XtraDrain combi front wall NW 100 H=150mm without nozzle
delivery time :
11-12 Working days
Price on request
GDM MULDENSTEIN nativo gray L/W/D: 30/30/(8-10)cm
delivery time :
4-6 Working days
€9.82
incl. VAT / pcs.
Triuso hand brush coconut bristles
delivery time :
4-6 Working days
€9.40
incl. VAT / pcs.
Erlus E58 renovation flat roof tile 1st grade red engobed - M
delivery time :
10-11 Working days
Price on request