For leveling a ridge covering with two ridge end tiles. Since both ridge sides begin with a ridge end tile, a ridge leveling tile must be used at the transition.
Requirement: 1 pc./ridge
Erlus:
incl. VAT plus shipping costs
delivery time 10-11 Working days
News about offers, events, our company and tips & tricks