STIHL guide bar Rollomatic E Kickback-reduced standard bar Body made of three electrically... more
Productdescription
STIHL guide bar Rollomatic E
- Kickback-reduced standard bar
- Body made of three electrically welded metal plates, with the middle one having a large recess
- Low weight, high stability, available with small and large bar head
- Maintenance-free thanks to closed bearing on the deflection star
Technical Data
| Marke: | Stihl |
| Kettenteilung: | 3/8"P |
| Schwertlänge (cm): | 35 |
| Nutbreite bis (mm): | 1,3 |
| Nutbreite von (mm): | 0 |
| Artikelart: | Führungsschiene |
| Hersteller: | STIHL |
PRODUCT LINKS
Stihl guide bar Rollomatic E 3/8" P 1.3mm 35cm - 30050004809
- Article no.: 7030339905
- EAN: 0795711039004
Price upon request
incl. VAT plus shipping costs
delivery time 4-6 Working days
Product can be picket up at
Amount:
Bosch two-hole wrench straight for angle grinder GGS 6 S
delivery time :
3-4 Working days
Price on request
Bosch backing plate Ø125mm flange thread M14
delivery time :
3-4 Working days
€15.47
incl. VAT / pcs.
Bosch backing plate Ø125mm flange thread M14
delivery time :
9-10 Working days
€15.47
incl. VAT / pcs.
Velux Eindeck. Ziegel/H EDW PK06 2000 u. Dämm- u. Anschlussset BDX Alu
delivery time :
4-6 Working days
€227.29
incl. VAT / pcs.
VELUX INTEGRA solar oven. GGU FK08 036630 Polyur. EN. PLUS Ti rolled 66x140
delivery time :
7 Working days
Price on request
Lithonplus plate Pasand 40x40x4.2 oyster beige bcs
delivery time :
7 Working days
Price on request
Bosch EXPERT PowerChange Plus Hex 11 HSS-G 7.15x105mm pilot drill bit 2-piece.
delivery time :
4-6 Working days
€46.89
incl. VAT / pcs.
EL 30x90x2 KANN YAMINO dark grey STR mottled structured
delivery time :
26-30 Working days
Price on request
Grömo CU rainwater flap DN80 with stainless steel strainer V2A
delivery time :
4-6 Working days
€116.74
incl. VAT / pcs.
Paving Double-T End Stone 10cm grey. concrete smooth
delivery time :
16-18 Working days
Price on request