Unsere Fachbereiche

No results were found for the filter!
Lehmann CU drain pipe clamp DN60mm with pin 150mm for hammering in Lehmann CU drain pipe clamp DN60mm with pin 150mm for hammering in
delivery time : 4-6 Working days
€11.42
(€11.42 / Piece)
To the product
Landolt ALLPROTECT Flex 1x25m protective fleece self-adhesive Landolt ALLPROTECT Flex 1x25m protective fleece self-adhesive
delivery time : 4-6 Working days
€232.00
(€9.28 / square meters)
To the product
APD repair tube 3/4'' 16049 APD repair tube 3/4'' 16049
delivery time : 4-6 Working days
€3.57
(€3.57 / Piece)
To the product
Dywidag D15 connecting sleeve SW 30x90mm Dywidag D15 connecting sleeve SW 30x90mm
delivery time : 4-6 Working days
Price on request
To the product
Grömo leaf sieve DN100 galvanized steel Grömo leaf sieve DN100 galvanized steel
delivery time : 4-6 Working days
€6.55
(€6.55 / Piece)
To the product
BOSCH EXPERT hammer drill SDS plus-7X 6x50x115mm BOSCH EXPERT hammer drill SDS plus-7X 6x50x115mm
delivery time : 4-6 Working days
€10.71
(€10.71 / Piece)
To the product
GftK VDW 850 plus 2k joint mortar natural 25kg self-compacting GftK VDW 850 plus 2k joint mortar natural 25kg self-compacting
delivery time : 4-6 Working days
€148.75
(€5.95 / KILOGRAM)
To the product
GARTENAKTION
Flex Premium Bit Set 41-piece Flex Premium Bit Set 41-piece
delivery time : 4-6 Working days
#NV €53.55 #NV €32.50
(€32.50 / Piece)
To the product
Betonstahlkupplung D25 L = 390mm mit Sichtloch Betonstahlkupplung D25 L = 390mm mit Sichtloch
delivery time : 4-6 Working days
€142.80
(€142.80 / Piece)
To the product
Stufen-Kanten-Klammer Kopf für NM, Prima und SE aus Edelstahl Stufen-Kanten-Klammer Kopf für NM, Prima und SE aus Edelstahl
delivery time : 4-6 Working days
€10.71
(€10.71 / Piece)
To the product
Maisch connection profile TB 12.5mm 3.0m 01319 300.0 for 15mm shadow gap Maisch connection profile TB 12.5mm 3.0m 01319 300.0 for 15mm shadow gap
delivery time : 4-6 Working days
€18.92
(€6.31 / Linear meters)
To the product
Nevoga bottom strip full 30mm length 200cm - with side flow hole Nevoga bottom strip full 30mm length 200cm - with side flow hole
delivery time : 4-6 Working days
€108.41
(€1.08 / Linear meters)
To the product
KEMPERTEC® EP5 primer blue 3kg container (3x 1kg kneading bags) KEMPERTEC® EP5 primer blue 3kg container (3x 1kg kneading bags)
delivery time : 4-6 Working days
€176.37
(€58.79 / KILOGRAM)
To the product
Aluminum board 0.8x1000x2000mm 99.5 HH Blank per board 4.5kg Aluminum board 0.8x1000x2000mm 99.5 HH Blank per board 4.5kg
delivery time : 4-6 Working days
€69.08
(€15.35 / KILOGRAM)
To the product
Copper gravel strips 55mm length 2.00m Copper gravel strips 55mm length 2.00m
delivery time : 4-6 Working days
€51.88
(€25.94 / Linear meters)
To the product
SWG threaded rods vz 1mtr M16 SWG threaded rods vz 1mtr M16
delivery time : 4-6 Working days
€11.42
(€11.42 / Piece)
To the product
Prima building board 6mm 1300x600mm tile element Prima building board 6mm 1300x600mm tile element
delivery time : 4-6 Working days
€27.75
(€35.58 / square meters)
To the product
Pica BIG Dry replacement leads 12 x carpenter's leads 2H Pica BIG Dry replacement leads 12 x carpenter's leads 2H
delivery time : 4-6 Working days
€18.09
(€18.09 / Set)
To the product
Lehmann metal roof tile Heidelberger Dachsteine "Click17" vz Lehmann metal roof tile Heidelberger Dachsteine "Click17" vz
delivery time : 4-6 Working days
€43.79
(€43.79 / Piece)
To the product
Bosch screwdriver bit extra-hard 3-pack PZ3 XH 89mm Bosch screwdriver bit extra-hard 3-pack PZ3 XH 89mm
delivery time : 4-6 Working days
€17.73
(€17.73 / pack)
To the product
74 From 416
last seen

Newsletter

News about offers, events, our company and tips & tricks