Unsere Fachbereiche

No results were found for the filter!
VIBA perforated tape 50x2.0 mm galvanized Hole Ø 20/22mm Hole spacing 50mm VIBA perforated tape 50x2.0 mm galvanized Hole Ø 20/22mm Hole spacing 50mm
delivery time : 4-6 Working days
€282.75
(€11.31 / Linear meters)
To the product
ALUJET Walljet PP 50mx30cm ALUJET Walljet PP 50mx30cm
delivery time : 4-6 Working days
€103.50
(€6.90 / square meters)
To the product
Rockpanel Colors Durable Standard 2500x1200x8mm RAL 7016 Rockpanel Colors Durable Standard 2500x1200x8mm RAL 7016
delivery time : 4-6 Working days
€481.95
(€160.65 / square meters)
To the product
Rapid Staples 53/06mm Steel galvanized 5000 pieces Rapid Staples 53/06mm Steel galvanized 5000 pieces
delivery time : 4-6 Working days
€17.14
(€17.14 / pack)
To the product
Bosch Sandpaper Set Delta 93 10 pcs. RedWood Top Bosch Sandpaper Set Delta 93 10 pcs. RedWood Top
delivery time : 4-6 Working days
€9.40
(€9.40 / pack)
To the product
ARDEX K71 Dickschichtausgleich 25kg 3-50mm ARDEX K71 Dickschichtausgleich 25kg 3-50mm
delivery time : 4-6 Working days
€62.24
(€62.24 / BAG)
To the product
Hartholzkeile 200x80x38mm 100 Stück pro Sack Hartholzkeile 200x80x38mm 100 Stück pro Sack
delivery time : 4-6 Working days
€99.25
(€0.99 / Piece)
To the product
Stöckl Ziegelstürze 17.5x11.3 - 150cm Stöckl Ziegelstürze 17.5x11.3 - 150cm
delivery time : 4-6 Working days
€44.99
(€29.99 / Linear meters)
To the product
Ratchet lashing strap 0.7to 1pc 25mm 4m 1 piece Ratchet lashing strap 0.7to 1pc 25mm 4m 1 piece
delivery time : 4-6 Working days
€5.95
(€5.95 / Piece)
To the product
Upmann inspection doors Softline white 50x50cm - 20530 Upmann inspection doors Softline white 50x50cm - 20530
delivery time : 4-6 Working days
€88.54
(€88.54 / Piece)
To the product
Rockwool roof insulation board Masterrock 035GF 2000x600x100mm Rockwool roof insulation board Masterrock 035GF 2000x600x100mm
delivery time : 4-6 Working days
€85.10
(€70.92 / square meters)
To the product
Lehmann CU drain pipe clamp DN60mm with pin 150mm for hammering in Lehmann CU drain pipe clamp DN60mm with pin 150mm for hammering in
delivery time : 4-6 Working days
€11.42
(€11.42 / Piece)
To the product
Heraklith C cement-bonded wood wool board Format: 2000x600x50 mm Heraklith C cement-bonded wood wool board Format: 2000x600x50 mm
delivery time : 4-6 Working days
€53.83
(€44.86 / square meters)
To the product
ZZ - Strip 50 A tested according to DBV Length 200cm - 80m bundle ZZ - Strip 50 A tested according to DBV Length 200cm - 80m bundle
delivery time : 4-6 Working days
€134.23
(€1.68 / Linear meters)
To the product
Nevoga fiber concrete pipe 22mm length 24cm Nevoga fiber concrete pipe 22mm length 24cm
delivery time : 4-6 Working days
€51.88
(€1.30 / Piece)
To the product
Dywidag D15 connecting sleeve SW 30x90mm Dywidag D15 connecting sleeve SW 30x90mm
delivery time : 4-6 Working days
€10.12
(€10.12 / Piece)
To the product
Knauf AQUAPANEL® joint and surface filler 20kg white Knauf AQUAPANEL® joint and surface filler 20kg white
delivery time : 4-6 Working days
€128.60
(€6.43 / KILOGRAM)
To the product
ISOVER ULTIMATE UKF 034 twin 10000x1200x60mm sub-rafter clamping felt ISOVER ULTIMATE UKF 034 twin 10000x1200x60mm sub-rafter clamping felt
delivery time : 4-6 Working days
€314.16
(€26.18 / square meters)
To the product
Betonstahlkupplung D25 L = 390mm mit Sichtloch Betonstahlkupplung D25 L = 390mm mit Sichtloch
delivery time : 4-6 Working days
€142.80
(€142.80 / Piece)
To the product
Stufen-Kanten-Klammer Kopf für NM, Prima und SE aus Edelstahl Stufen-Kanten-Klammer Kopf für NM, Prima und SE aus Edelstahl
delivery time : 4-6 Working days
€10.71
(€10.71 / Piece)
To the product
75 From 416
last seen

Newsletter

News about offers, events, our company and tips & tricks