No results were found for the filter!
Gravel washed 16/32 mm in BigBag (incl. disposable BigBag) approx. 800 kg filling
delivery time :
4-6 Working days
€188.02
(€188.02 / BigBag)
SECURANTA folding clamp with eyelet
delivery time :
4-6 Working days
€85.80
(€85.80 / Piece)
FSTZ floor tile "ROMA" antracite 30x60x8 R10B
delivery time :
4-6 Working days
€22.28
(€15.47 / square meters)
Granite strip stone grey 6x30x100 cm sawn & blasted
delivery time :
4-6 Working days
€50.46
(€50.46 / Piece)
Layher Holz-Stufentritt 2 Stufen
delivery time :
4-6 Working days
€87.94
(€87.94 / Piece)
Gebol Handschuh Blue Tech Gr. 10
delivery time :
4-6 Working days
€11.07
(€11.07 / Pair)
Toge Isolierschraube TIS KORR 150mm C3 Torx TX30 - 100 Stück beige
delivery time :
4-6 Working days
€208.25
(€2.08 / Piece)
Lehmann CU umm. gutter hook half-round 33-25/6mm short cut
delivery time :
4-6 Working days
€14.40
(€14.40 / Piece)
KEMPERTEC® R-primer 2kg container (2x 1kg kneading bags)
delivery time :
4-6 Working days
€118.76
(€59.38 / KILOGRAM)
Nespoli Radiator Paint Roller 2 Pieces 7mm Nylon 10cm
delivery time :
4-6 Working days
€5.12
(€5.12 / PACK)
Eaves wedge plank 0x30x200mm technically dried 4.00m
delivery time :
4-6 Working days
€22.36
(€5.59 / Linear meters)
KVH nsi domestic spruce S10 100x100x5000mm according to DIN 4074
delivery time :
4-6 Working days
€100.85
(€20.17 / Linear meters)
Triuso tile wedges plastic 250 pieces 30x6x0-5mm
delivery time :
4-6 Working days
€4.88
(€4.88 / BAG)
Triuso smoothing trowel 28x13cm series cork handle stainless steel untoothed
delivery time :
4-6 Working days
€23.56
(€23.56 / Piece)
Beko Silicon pro4 Premium 310ml black
delivery time :
4-6 Working days
€19.40
(€19.40 / CARTRIDGE)
Knauf fire protection panel Piano GKFI 12.5mm 2000x1250mm HRAK impregnated
delivery time :
4-6 Working days
€42.85
(€17.14 / square meters)
Nevoga Konus 22mm pressure cone
delivery time :
4-6 Working days
€42.60
(€0.09 / Piece)
Copper pipe Ø 120 0.6mm length 2.00m welded
delivery time :
4-6 Working days
€146.84
(€73.42 / Linear meters)
Zambelli CU gutter protection Gutter Stark® for gutter Ø333mm 2000mm
delivery time :
4-6 Working days
€105.20
(€52.60 / Linear meters)
Icopal Polar SK 10qm roll
delivery time :
4-6 Working days
€142.80
(€14.28 / square meters)
Volfi joint spacer FK-A 5/19-55mm black break-off leg - 250 pcs./bag
delivery time :
4-6 Working days
€78.84
(€0.32 / Piece)
Schake Euro1 barrier fence 2.00m incl. adapter retrorefl. Foil 3M
delivery time :
4-6 Working days
€166.60
(€166.60 / Piece)
Schake beacon light bast double-sided yellow without lamp holder
delivery time :
4-6 Working days
€56.53
(€56.53 / Piece)
Knauf screw grip spatula 2014 150mm blade length with integrated bit
delivery time :
4-6 Working days
€44.74
(€44.74 / Piece)