Copper drain pipe 120 mm bare Material thickness 0.6 mm welded version Length 2.0 m more
Productdescription
Copper drain pipe
- 120 mm
- bare
- Material thickness 0.6 mm
- welded version
- Length 2.0 m
Technical Data
| Stärke (mm): | 0,6 |
| Farbe: | blank |
| Länge (mm): | 2000 |
| Artikelart: | Ablaufrohr |
| Hersteller: | Palmer Bleche |
PRODUCT LINKS
Copper pipe Ø 120 0.6mm length 2.00m welded
- Article no.: 2050530135
- EAN: 2020505301356
€116.86
*
(€58.43 / Linear meters)
incl. VAT plus shipping costs
delivery time 4-6 Working days
Product can be picket up at
Amount:
MASC ladder safety device 200x120x100mm 0.7kg
delivery time :
4-6 Working days
€117.81
incl. VAT / pcs.
Gloves MaxiFlex Ultimate five fingers size. 10D-34-10
delivery time :
11-12 Working days
Price on request
Hymer telescopic ladder ZoomMaster 11 Spr. L 0.92-3.46
delivery time :
9-10 Working days
Price on request
Uvex safety glasses pheos colorless sv black exc. green
delivery time :
4-6 Working days
€23.21
incl. VAT / pcs.
Copper pipe Ø 100 0.6mm length 2.00m welded
delivery time :
4-5 Working days
€89.96
incl. VAT / pcs.
Copper pipe Ø 100 0.6mm length 3.00m welded
delivery time :
4-5 Working days
€151.38
incl. VAT / pcs.
Copper pipe Ø 100 0.6mm length 3.00m welded
delivery time :
4-6 Working days
€151.38
incl. VAT / pcs.
Grömo UGINOX PatinaK41 drain pipe bend DN100 72° without inlet
delivery time :
4-6 Working days
€18.68
incl. VAT / pcs.
Uginox FTE pipe welded Ø 100 0.5mm length 2.00m
delivery time :
4-6 Working days
€44.50
incl. VAT / pcs.
Lehmann CU hanger bolts yellow passivated M10x140mm
delivery time :
11-12 Working days
Price on request
Lehmann CU drain pipe clamp DN120mm with threaded socket M8/M10
delivery time :
4-6 Working days
€15.95
incl. VAT / pcs.
Cu Band-EM material semi-hard SF-CU-F24 according to DIN EN 1172 Add. 0.6x670mm
delivery time :
4-6 Working days
€2,329.80
incl. VAT / pcs.
Drakena gutter iron pin fvz roughened 5.5x100mm a 5.0kg
delivery time :
4-6 Working days
€76.87
incl. VAT / pcs.
Bauder THERMOPLAN-T 18 silver grey 150cm
delivery time :
9-10 Working days
€831.90
incl. VAT / pcs.
Beko Gecko Hybrid POP Adhesive/Sealant 310ml grey
delivery time :
4-6 Working days
€29.39
incl. VAT / pcs.
MASC standing seam sealing tape 1/9mm roll 10m
delivery time :
4-6 Working days
€7.00
incl. VAT / pcs.
Copper perforated sheet 0.6x1000x2000mm Rv 5/7 free ventilation cross-section 46.27%
delivery time :
4-6 Working days
€238.00
incl. VAT / pcs.
Uginox FTE gutter 33 0.5mm large bead length 5.00m
delivery time :
4-6 Working days
€105.30
incl. VAT / pcs.
Cu Band-EM material semi-hard SF-CU-F24 according to DIN EN 1172 Add. 0.6x1000mm
delivery time :
4-6 Working days
#NV
€2,506.68
incl. VAT / pcs.
Lehmann VZ gutter hook half-round 33-25/6mm Munich version
delivery time :
4-6 Working days
€6.43
incl. VAT / pcs.
Copper pipe Ø 100 0.6mm length 2.00m welded
delivery time :
4-6 Working days
€89.96
incl. VAT / pcs.