No results were found for the filter!
Nevoga Plexus single strip 8 mm-150mm WS 90 reinforcement connection 50-8-15 1rhg
delivery time :
4-6 Working days
€14.28
(€11.42 / Linear meters)
Quick fiber concrete triangular strip 25/18 K1 25mm K1 18cm with one clamp
delivery time :
4-6 Working days
€75.18
(€0.43 / Piece)
Nevoga fiber concrete snake 35mm without studs length 80cm
delivery time :
4-6 Working days
€1.30
(€1.30 / Piece)
Snake S 10 DBV certified L 200cm bundle 25 pieces
delivery time :
4-6 Working days
€95.20
(€1.90 / Linear meters)
Snake S 12 DBV certified L 200cm bundle 25 pieces
delivery time :
4-6 Working days
€102.34
(€2.05 / Linear meters)
Nevoga Plexus single strip 10mm-150mm WS 90 reinforcement connection 60-10-15 1rhg
delivery time :
4-6 Working days
€20.23
(€16.18 / Linear meters)
Railing boards 32x154x4000mm FI/TA completely dyed/dipped red
delivery time :
4-6 Working days
€18.56
(€4.64 / Linear meters)
Hauff standard annular space seal DN 200 HSD 200 SSG 1x110/125/135/160
delivery time :
4-6 Working days
€170.17
(€170.17 / Piece)
Mastertec MASTERSTOP bentonite swelling tape dimensions: 25x20mm black
delivery time :
4-6 Working days
€57.10
(€11.42 / Linear meters)
Calenberg Cipolon edge protection thickness approx. 7mm - 1 roll 10mx30mm
delivery time :
4-6 Working days
€114.20
(€11.42 / Linear meters)
Ruch TEMPO -Schaler No. 6 for round iron 4-10mm base plate 42x105mm
delivery time :
4-6 Working days
€5.12
(€5.12 / Piece)
Nevoga Plexus stirrup bar 8mm- 150mm WS 160-180 reinforcement connection 115-8-15
delivery time :
4-6 Working days
€26.48
(€21.18 / Linear meters)
ZZ - Strip 35 A tested according to DBV Length 200cm - 80m bundle
delivery time :
4-6 Working days
€87.49
(€1.09 / Linear meters)
Mastertec Armouring clamp vz M10 Connection of the round conductor to the armouring
delivery time :
4-6 Working days
€5.71
(€5.71 / Piece)
Nevoga Plexus stirrup bar 8mm- 150mm WS 180-220 reinforcement connection 145-8-15
delivery time :
4-6 Working days
€28.41
(€22.73 / Linear meters)
Scaffolding bracket DM 10mm made of BST IV ribbed
delivery time :
4-6 Working days
€4.40
(€4.40 / Piece)
Reducing coupling F WSP for water barrier B15
delivery time :
4-6 Working days
€0.46
(€0.46 / Piece)
Dywidag D15 hook anchor 450mm do not weld/heat
delivery time :
4-6 Working days
€11.07
(€11.07 / Piece)
Nevoga Plexus stirrup bar 10mm- 150mm WS 160-180 reinforcement connection 115-10-15
delivery time :
4-6 Working days
€35.40
(€28.32 / Linear meters)
Nevoga bottom strip full 25mm length 200cm - with side flow hole
delivery time :
4-6 Working days
€99.96
(€1.00 / Linear meters)
Grounding strap 30x3.5mm fvz approx. 25.50kg/30m zinc coating 500g/m²
delivery time :
4-6 Working days
€151.73
(€5.95 / KILOGRAM)
Dywidag D15 loop anchor 550mm do not weld/heat
delivery time :
4-6 Working days
€23.56
(€23.56 / Piece)
Spritzplast MAXI 55mm 8-20 clamping star Flinky
delivery time :
4-6 Working days
€39.27
(€0.79 / Piece)