No results were found for the filter!
Mastertec Nippel für Befestigungspacker Kegelkopfnippel
delivery time :
4-6 Working days
€2.62
(€2.62 / Piece)
Hauff standard annular space seal DN 100 HSD 100 SSG 18-65 mm stepless
delivery time :
4-6 Working days
€86.87
(€86.87 / Piece)
Nevoga bottom strip 25mm length 200cm with recess
delivery time :
4-6 Working days
€81.40
(€0.81 / Linear meters)
Hauff standard annular space seal DN 150 HSD150 SSG 1x75/90/110 b40
delivery time :
4-6 Working days
€146.37
(€146.37 / Piece)
Snake S 12 DBV certified L 200cm bundle 25 pieces
delivery time :
4-6 Working days
€102.94
(€2.06 / Linear meters)
Nevoga Plexus stirrup bar 10mm- 150mm WS 160-180 reinforcement connection 115-10-15
delivery time :
4-6 Working days
Price on request
Nevoga Plexus stirrup bar 8mm- 150mm WS 180-220 reinforcement connection 145-8-15
delivery time :
4-6 Working days
€28.71
(€22.97 / Linear meters)
Nevoga bottom strip full 40mm length 200cm - with side flow hole
delivery time :
4-6 Working days
€100.67
(€1.68 / Linear meters)
Reducing coupling F WSP for water barrier B15
delivery time :
4-6 Working days
€0.47
(€0.47 / Piece)
Betomax dowel anchor B15 for drill hole 37mm with approval
delivery time :
4-6 Working days
€19.99
(€19.99 / Piece)
Spritzplast MAXI 55mm 8-20 clamping star Flinky
delivery time :
4-6 Working days
€39.92
(€0.80 / Piece)
punching shear reinforcement 14/175-3/390
delivery time :
4-6 Working days
€32.37
(€32.37 / Piece)
ZZ - Strip 40 A tested according to DBV Length 200cm - 80m bundle
delivery time :
4-6 Working days
€104.72
(€1.31 / Linear meters)
Nevoga Plexus stirrup bar 10mm- 150mm WS 200-240 reinforcement connection 175-10-15
delivery time :
4-6 Working days
€42.10
(€33.68 / Linear meters)
Mastertec MASTER sealing sheet SFG crack-preventing element for straight joints
delivery time :
4-6 Working days
€225.20
(€90.08 / Linear meters)
Mastertec Erdungsfestpunkt M10/M12 m. Achse vz 200mm Ø80mm Edelstahl V4A
delivery time :
4-6 Working days
€38.68
(€38.68 / Piece)
Nevoga Plexus stirrup bar 12mm- 150mm WS 180-200 reinforcement connection 145-12-15
delivery time :
4-6 Working days
€54.89
(€43.91 / Linear meters)
PEC-TA-CE-28/15-FV-PKF-3050mm anchor rail 3050mm long hot-dip galvanized
delivery time :
4-6 Working days
€78.05
(€25.59 / Linear meters)
Nevoga ring spacer 40mm 4-12 clamping star Flinky
delivery time :
4-6 Working days
€23.95
(€0.19 / Piece)
Nevoga ring spacer 35mm 4-12 clamping star Flinky
delivery time :
4-6 Working days
€30.23
(€0.15 / Piece)
Nevoga bottom strip full 25mm length 200cm - with side flow hole
delivery time :
4-6 Working days
€104.01
(€1.04 / Linear meters)
Nevoga bottom strip full 30mm length 200cm - with side flow hole
delivery time :
4-6 Working days
€108.29
(€1.08 / Linear meters)
Mastertec formwork element ABS 300 toothed joint sealing sheet 160mm
delivery time :
4-6 Working days
Price on request
Nevoga plastic triangular strip 15mm with nail flag hollow
delivery time :
4-6 Working days
€3.57
(€1.43 / Linear meters)