Half standard brick For compensating for covering widths where the corresponding width cannot... more
Productdescription
Half standard brick 10 format 150 mm 7 format 165 mm
For compensating for covering widths where the corresponding width cannot be achieved with the 300 mm grid (10 format) or 330 mm grid (7 format), and for connecting to roof structures, roof openings, valleys and ridges (depending on the model).
Covering width:
Technical Data
| Farbe: | rot |
| Serie: | Frankfurter Pfanne |
| Breite (mm): | 180 |
| Länge (mm): | 420 |
| Gewicht (kg): | 2.25 |
| Marke: | Braas |
| Regeldachneigung (°): | 22 |
| Artikelart: | Dachstein |
| Hersteller: | Braas |
PRODUCT LINKS
Braas Frankfurter Pfanne Protegon MATT Classic-Red Half Normal Stone
- Article no.: 2001010650
- EAN: 4015506318531
€7.02
*
(€7.02 / Piece)
incl. VAT plus shipping costs
delivery time 4-6 Working days
Product can be picket up at
Amount:
Braas Frankfurter Pfanne Protegon MATT Classic-Red Whole Normal Stone
delivery time :
4-6 Working days
€3.08
incl. VAT / pcs.
Braas Frankfurter Pfanne Protegon MATT Classic Red Giebelstein 8.8 LI
delivery time :
4-6 Working days
€28.20
incl. VAT / pcs.
Braas Frankfurter Pfanne Protegon MATT Classic Red Giebelstein 8.8 RE
delivery time :
4-6 Working days
€28.20
incl. VAT / pcs.
CRE Ridge/Hip Stone Rounded universal classic red
delivery time :
3-4 Working days
Price on request
Erlus Ergoldsbacher large interlocking tile 1st grade natural red - N
delivery time :
4-5 Working days
Price on request
Erlus Ergoldsbacher large interlocking tile 1st grade natural red - N
delivery time :
10-11 Working days
Price on request
Mastertec FASO 100/250 fiber cement casing pipe
delivery time :
13-15 Working days
€71.16
incl. VAT / pcs.
Solnhofer Portland limestone cement CEM II A-LL 52.5 N 25kg high-quality cement
delivery time :
4-6 Working days
€11.48
incl. VAT / pcs.
Fischer universal dowel DUOPOWER 12x60 LD VE=25
delivery time :
4-6 Working days
€12.38
incl. VAT / pcs.
Fischer long-shaft dowel SXRL 14x200 FUS E
delivery time :
4-6 Working days
€14.16
incl. VAT / pcs.
Gftk vdw 480 bedding compound cement grey 25kg
delivery time :
4-6 Working days
€32.75
incl. VAT / pcs.
Fischer toggle anchor KDH 4 VE=25
delivery time :
4-6 Working days
€88.06
incl. VAT / pcs.
Fischer nail anchor N 6x40/7 P VE=100 pieces
delivery time :
13-15 Working days
€22.49
incl. VAT / pcs.
Hasit 620 cement plaster 1.5mm 30kg bag base plaster
delivery time :
4-6 Working days
€15.85
incl. VAT / pcs.
Braas Frankfurter Pfanne Protegon MATT Granite Whole Normal Stone
delivery time :
4-6 Working days
€3.08
incl. VAT / pcs.
Klöber Easy-Form® UNI-connection tape KW0300 300x5000mm red
delivery time :
4-6 Working days
€236.80
incl. VAT / pcs.